IPC construction risk tool

Infection-control risk assessment before hospital construction or renovation

ICRA helps hospitals decide construction controls based on activity type, patient-risk group, infection-control class and work-area controls before renovation begins.

Template Fields

  • Construction activity type
  • Patient-risk group
  • Infection-control class
  • Barriers
  • Airflow
  • Dust suppression
  • Cleaning
  • Waste route
  • PPE
  • Monitoring
  • Authorisation

How to Use This Tool

  • Describe the activity and location before work starts.
  • Identify nearby vulnerable patient groups and service disruption risk.
  • Select barrier, airflow, cleaning, PPE, waste-route and monitoring controls.
  • Authorise work only after IPC, facility and user-department review.
  • Monitor controls during work and close observations before handover.

NABH Implementation Relationship

ICRA is linked to IPC construction and renovation risk controls because dust, airflow disruption, waste movement and traffic changes can increase infection risk.

ICRA Checklist

CSV checklist for infection-control risk assessment during hospital construction or renovation.

Download CSV

HTML Preview

Preview of the downloadable CSV template.
Construction Activity TypePatient-risk GroupInfection-control ClassBarriersAirflowDust SuppressionCleaningWaste RoutePPEMonitoringAuthorisation
Ceiling repair near ICUHigh-risk inpatientsClass IIIFull-height sealed barrierNegative pressure or sealed return as approvedWet cutting and covered material movementTerminal clean after workDefined non-patient routeN95 or approved respiratory protection for workersIPC nurse round every shiftIPC and facility head approval
Minor painting in OPD waiting areaGeneral outpatientClass IArea cordon and signageNatural ventilation away from clinical zonesDust-free preparationDamp cleaning after workService corridor routeGloves and maskDaily area checkFacility manager approval

Related Resource Pages

Link to NABH Consultancy Services

These resources support implementation planning, but hospitals remain responsible for actual adoption, evidence and decisions. Humble Aim Enterprises provides independent readiness support and does not guarantee accreditation.

Official Sources

This ICRA page provides original implementation guidance for IPC-linked renovation controls and does not replace official NABH requirements.

Last reviewed:

Prepared By

Humble Aim Editorial Team
Healthcare consultancy content team

Reviewed By

Humble Aim Review Team
Reviewed for source alignment and service accuracy

Need NABH readiness support?

Share your hospital scope, current quality-system maturity and target NABH route. Humble Aim Enterprises can help structure the next practical steps.